Back to top

Operators who stage pipe, tanks, rental iron and trucks north of Odessa want a yard that stays level under stacked loads and does not turn to mud after a storm. In Gardendale we build concrete lay-down areas, pipe rack bases, shop floors and truck pads for those users, and we price the base along with the slab because the base decides whether the stack leans.

State Highway 158 forms the northern edge of the community in northeastern Ector County, and downtown Odessa lies about 14 miles to the south. That distance sets the mix and the schedule: ready-mix from the Odessa side arrives in time for a normal pour, and crews can reach the site early in the day. Gardendale is part of the Odessa metropolitan statistical area, so the same crews, suppliers and inspectors that serve the city serve it.

Ector County's land is level to rolling, at elevations between 2,500 and 3,300 feet, and very little of it is prime farmland. For us that means open lots, caliche close to the surface and few obstacles, which suits yard work well. We pour and finish the concrete, and trade partners we coordinate prepare the ground and run the underground lines.

Heavy iron and a busy yard

A lay-down yard is dangerous before the concrete is even poured. Cranes, forklifts and loaded trucks move through the same space, and concrete trade partners work among them. We agree with the yard manager on a traffic plan, mark the pour limits with barricades and set a spotter wherever a truck backs. Rebar and form stakes are capped or flagged, and washout is contained.

The community's open exposure means little shade and a lot of wind. Crews get a cooling station, schedule breaks and rotate through the finishing work. On windy days we shield the pour from blowing dust and halt finishing if gusts could carry debris onto the surface.

What gets built beside the yard

Yards come with buildings: a steel shop, an office trailer pad, a parts warehouse. A warehouse for pipe fittings and valves needs a smooth floor and a dock, while a shop for repair needs reinforcement at lift points and a drain in the right place. A metal building sits on a slab and footings designed to its reactions, and we set the anchor bolts exactly where the supplier's plan puts them.

Small office buildings and equipment sheds on the same site get slabs that tie into the yard without cold joints at the doors.

Customers here are often renters of space as much as owners, so the slab has to suit the next tenant as well as the first. A flat, well-jointed floor and a thick apron keep a building useful for whoever signs the next lease.

From stripped ground to cured yard

We strip vegetation, grade to the plan and compact a caliche or gravel base. Then we set forms, place reinforcing and pour. Pipe-rack bases are separate footings or thickened strips, and a laydown slab for tanks is poured flat with a slight fall to the drain. The surface is broom-finished so tires and boots can grip.

After curing, we saw joints and fill them where fluids are present. An entry apron at the highway is made thicker than the interior so the yard does not break down where trucks turn first. Ask us about truck courts and dock aprons if your yard sees many tractor-trailers.

Because Gardendale lies on the road between Midland and the northern oilfield, many yards serve crews working both sides. A good yard has more than one gate and a turning circle large enough for a trailer without backing, and we add that to the layout before we pour.

How we run a yard job

We begin by asking what the yard will hold, how it will be loaded and what the worst week looks like. A pipe stack, a crane outrigger and a rental fleet each place different loads on the slab, and we set the thickness for the worst case. We then walk the ground and decide where drains and sumps should go.

During the pour, one person is responsible for the mix and the truck line, another for the finishing and a third for the cure. After curing, we walk the yard with the manager and point out what the slab can and cannot do on day one. We would rather give you a plain list than let a forklift find the limit.

If the owner has a plan from an engineer, we follow it. If not, we sketch a layout on the site, show it to the yard manager and revise it until it works. The aim is a pour that nobody has to cut apart in a year.

Services that go with a yard

The yard is only the start. Equipment pads and machine foundations carry generators, compressors and tanks. Containment pads protect the ground where fluids are handled, and trench drains catch what the slab sheds.

When an operator wants to expand, we saw and core the existing slab and tie new concrete into it. The same crew can do all of it on one mobilization.

Fuel and wash areas get their own treatment: sloped, curbed slabs that send fluids to a sump rather than the lot. We build them alongside the yard so the joints match and the sump sits at the right depth.

Permits for an unincorporated community

Gardendale is a census-designated place, not an incorporated city, so the permit path can differ from the one inside Odessa. We ask the owner which office has authority for the site, and we get the answer in writing before we price. Typical items include driveway access to the highway, a drainage review and a building permit for any structure.

If the lot fronts State Highway 158, the state's right-of-way rules apply to the entrance. The adopted building code covers enclosed buildings, and the engineer's drawings control the yard slab. We read both before we commit to a schedule. Work for industrial and manufacturing owners in the city of Odessa follows the same steps.

Bring us the yard layout

Send the site layout, the stack loads and the dates you are working toward. We will visit the lot north of Odessa and mark where the slab, drains and aprons should go.

Common Questions

How thick should a pipe yard slab be?

It depends on the stack height, the pipe weight and the equipment that moves it. We ask for the loads and design the thickness and reinforcing from them. A light parts yard and a loaded pipe yard are not the same slab.

Can you build a yard in phases?

Yes. We pour the highest-use areas first and expand as the budget allows. Dowels and keyed joints let future sections tie into the existing pavement.

Who handles the grading and underground lines?

Trade partners we coordinate do the earthwork and utilities. We schedule them ahead of our pour so the base is ready when the trucks arrive.

What permits does a Gardendale job need?

It varies with the site. We ask which office governs the lot and what it requires for access, drainage and structures, and we build those steps into the schedule.

How does wind affect a pour in Gardendale?

Wind dries the surface and carries dust. We use evaporation control, windbreaks and quick curing, and we adjust the hour of the pour if the forecast calls for a gusty day.