Back to top

A store owner or small developer in Kermit needs a pad that is level, drains off the lot and does not crack at the first door. Our work here is mostly the ordinary commercial pads of a working town: shop floors, retail slabs, office entries, paved parking, sidewalks and the aprons beside them. We build them as a package with the grading and drainage, because on flat ground a slab is only as good as its water plan.

Kermit shows what flat country does to a lot. Flooding recurred on the town's level terrain often enough that the town built crowned streets to push water off, and that habit is a lesson for every private site: a lot needs a high point, a path for runoff and an outlet that does not point at the neighbor. Before we quote a pad, we walk the lot, find where water has stood and set the finished floor above it.

Concrete trade partners mobilize to Kermit from the Odessa side of the Basin. We pour and finish the concrete, and trade partners we coordinate do the utility trenching and dirt work ahead of us.

What Kermit builds on

Oil found in the Hendrick field near Kermit on July 16, 1926 set the town's boom in motion, and the oil economy still decides what gets built: supply shops, truck lots, small offices and the stores that serve the people who work in them. State Highways 18, 302, 703 and 115 meet here, and Wink lies seven miles to the southeast, so the town works as a crossing for traffic between several oilfield communities.

That mix of commercial and light industrial demand means one contractor often pours a retail apron on Monday and a truck pad on Thursday. We keep both kinds of work on the same schedule, and we talk to commercial developers and owner-builders in the same plain terms.

For a general contractor, the pattern is useful. A single mobilization to Kermit can cover the building pad, the parking and the walks, and if a neighbor needs a slab the same week, we can usually fit it in. Our Odessa crews know the trucking distance and plan around it.

Groundwater, soil and site safety

In July 2017 the EPA added part of the Santa Rosa Aquifer in Kermit to the Superfund National Priorities List, with a groundwater plume about a mile long and 1.5 miles wide. For a pad contractor, that is a reason to ask questions, not a reason to stop. Before any excavation we ask the owner whether the lot lies near the plume, whether an environmental consultant has weighed in and what the plan is for soil and water that come out of a trench.

We keep dewatering, spoil handling and concrete washout under control on every job. Wash water goes to a lined pit, not the ground, and we haul or manage concrete waste where the owner directs. Crew safety is the usual set: spotters near trucks, caps on rebar and heat breaks on summer days.

Heat is the more routine hazard in Kermit. Summer afternoons wear on finishers, so we start early, rotate crews on the trowel and keep water and shade at the pour. Sunburn and heat illness are treated as real risks and are covered in the morning briefing.

Kermit and the highway towns around it

We take work in Kermit and along the corridors that join it to its neighbors. Wink is a short drive along State Highway 115, and Monahans is the next community we also work in. We plan deliveries from the nearest ready-mix source that can hold a mix in the heat.

Kermit's elevation is about 2,861 feet, which is high and open, and wind sweeps across a lot with little to stop it. We keep that in mind when we place a pad's long dimension and when we choose the hour for finishing.

A commercial pad from dirt to finish

The work starts at the bottom: strip the topsoil, compact the subgrade, bring in a uniform base and set the grades. We then place steel, form the edges and pour the slab. A retail or office pad usually gets a broom or light-trowel finish, while a shop floor gets a hard trowel and sealer. Joints are laid out in squares that keep cracks from wandering across the floor.

Edges, walks and approaches follow in a second phase. Our sidewalks and flatwork crews tie them to the building and the street, and we cut or form ramps where the plans call for accessible routes.

Parking is part of nearly every Kermit pad. We form curbs, place wheel stops and keep slopes gentle enough for water to leave but not so steep that a car rolls. Where the lot meets a state highway, the driveway cut follows the road owner's rules, and we ask about those before we draw the entrance.

Heat, dryness and flat ground

Kermit has a hot, arid climate and averages 11.71 inches of precipitation a year at the Winkler County Airport. Little rain does not mean little water on the lot. When rain comes, it comes hard, and on level ground it spreads. We design slopes with drains or swales that lead somewhere, and we protect the subgrade from a storm during the build.

Hot weather affects the concrete itself. Fresh slabs lose moisture quickly in dry air, so we use evaporation control and curing compound. For more on this work, see trench drains and concrete drainage, which often become part of a Kermit lot.

Buildings that sit on these pads

Most of the buildings are modest: an auto-parts store, a clinic addition, a supply shop, a lodging expansion or a small office. We pour for retail centers, for office buildings and for shops that sit on a slab with a few roll-up doors.

Each wants something slightly different. A store wants a smooth floor and a clean front walk. An office wants a level slab for flooring. A shop wants durability at the doors and a drain in the right place. We ask what goes in the building before we choose a finish.

Getting trucks and crews to Kermit

Ready-mix has to travel to a Kermit job, and in summer a long ride can shorten the working time of a load. We ask for a mix with retarder when the haul is long, schedule early starts and stage the crew so that the first truck unloads when the forms are ready.

For smaller pads we combine pours with another job on the same corridor to share mobilization. If your project is flexible about the day, tell us, and we will look for a window that keeps the price down and the weather in our favor.

Show us the lot

Send the address, a site sketch and the building plan for your Kermit lot. We will look at the drainage first and give you a pour plan that fits.

Common Questions

Do you work near the Superfund area in Kermit?

We first ask the owner and the environmental consultant where the lot lies in relation to the plume and what the plan is for soil and groundwater. We do not take on work that would conflict with those rules, and we handle spoil and washout carefully.

How do you deal with flooding on flat lots?

We set the finished floor above known standing water, slope paving to inlets or swales and make sure the outlet points somewhere the owner controls. Crowned surfaces and curb cuts are part of that plan.

What does a small commercial pad cost to pour in Kermit?

The price depends on size, thickness, base and finish, plus the cost of trucking ready-mix out to the site. We quote the dirt and the concrete separately which shows you what each part of the job costs.

Can you pour in the summer?

Yes. We plan for the heat with early starts, mixes that stay workable, wind protection and quick curing. Slabs poured on a calm morning come out better than those poured at noon.